Specific checks of air-conditioned systems including mechanical ventilation and hydraulic circuits to ensure suitability for commissioning.
Visual checks include all aspects of the systems from the electrical power source to fans, pumps, duct and pipe distribution, regulation devises and terminal units.
The pre commissioning checks are carried out to ensure the installation has been installed correctly and is compatible to the design requirements. |